Hi all,
I'm using Zimbra NE 7.1.0 on Ubuntu 10.04 x64 with a perpetual license.
I'm using 14 accounts and my license is for 25 accounts max.
When I try to run the upgrade to NE 7.1.1, I've got these errors:
./util/utilfunc.sh: line 1007: [: -gt: unary operator expected
./util/utilfunc.sh: line 1011: [: -lt: unary operator expected
Warning: The number of users on this system () exceeds the licensed number (50). You may continue with the upgrade, but you will not be able to create
new users. Also, initialization of the Document feature will fail. If you
later wish to use the Documents feature you'll need to resolve the licensing
issues and then run a separate script available from support to initialize the
Documents feature.
How can I correct this ?
Thanks,
Edit : I've just find this : http://bugzilla.zimbra.com/show_bug.cgi?id=60577...
[SOLVED] Error when upgrading from NE 7.1.0 to NE 7.1.1
-
- Posts: 17
- Joined: Fri Sep 12, 2014 11:51 pm
[SOLVED] Error when upgrading from NE 7.1.0 to NE 7.1.1
I just read through the bug report. Did you have Zimbra services stopped when you tried to upgrade?
-
- Posts: 17
- Joined: Fri Sep 12, 2014 11:51 pm
[SOLVED] Error when upgrading from NE 7.1.0 to NE 7.1.1
[quote user="xeon"]Did you have Zimbra services stopped when you tried to upgrade?[/QUOTE]
Yes, all Zimbra services was stopped.
Thanks
Yes, all Zimbra services was stopped.
Thanks
[SOLVED] Error when upgrading from NE 7.1.0 to NE 7.1.1
[quote user="4539dedisoft"]Yes, all Zimbra services was stopped.[/QUOTE]What happens if you run the upgrade with the Zimbra services started?
-
- Posts: 17
- Joined: Fri Sep 12, 2014 11:51 pm
[SOLVED] Error when upgrading from NE 7.1.0 to NE 7.1.1
[quote user="10330phoenix"]What happens if you run the upgrade with the Zimbra services started?[/QUOTE]
The license test pass successfully.
The license test pass successfully.
-
- Posts: 17
- Joined: Fri Sep 12, 2014 11:51 pm
[SOLVED] Error when upgrading from NE 7.1.0 to NE 7.1.1
[quote user="10330phoenix"]What happens if you run the upgrade with the Zimbra services started?[/QUOTE]
So I will launch the upgrade process while Zimbra is running.
Thanks for your help
So I will launch the upgrade process while Zimbra is running.
Thanks for your help
-
- Ambassador
- Posts: 2747
- Joined: Mon Dec 16, 2013 11:35 am
- Location: France - Drôme
- ZCS/ZD Version: All of them
- Contact:
[SOLVED] Error when upgrading from NE 7.1.0 to NE 7.1.1
[quote user="4539dedisoft"]So I will launch the upgrade process while Zimbra is running.[/QUOTE]
That's the correct way to upgrade ZCS.
That's the correct way to upgrade ZCS.
[SOLVED] Error when upgrading from NE 7.1.0 to NE 7.1.1
[quote user="8141Klug"]That's the correct way to upgrade ZCS.[/QUOTE]
Indeed. Even stats in the manual Zimbra will stop and start services as needed during the upgrade procedure.
Indeed. Even stats in the manual Zimbra will stop and start services as needed during the upgrade procedure.