Outlook connector upgrade after zimbra upgrade

Discuss your pilot or production implementation with other Zimbra admins or our engineers.
Post Reply
shriram.sampat
Posts: 38
Joined: Tue Nov 25, 2014 1:36 am

Outlook connector upgrade after zimbra upgrade

Post by shriram.sampat »

Currently we have 8.5.1, I want to upgrade to 8.6 latest with patches
I have many users connecting with outlook, who have the 8.5.1 connector.
Will they be able to work with their connector untill I install the new connector in the computer ?
is uninstalling old connector and installing the new one enough or is there another procedure to update the connector in pc ?
Thanks for your support
Ram
User avatar
jorgedlcruz
Zimbra Alumni
Zimbra Alumni
Posts: 2782
Joined: Thu May 22, 2014 4:47 pm

Outlook connector upgrade after zimbra upgrade

Post by jorgedlcruz »

Hi Shriam,

That's never been officially supported. Only supported to run the same version of zco as the zcs server, but should work. The Clients can click in Help, about the ZCO to upgrade it.



Let us know.
Jorge de la Cruz https://jorgedelacruz.es
Systems Engineer at Veeam Software https://www.veeam.com/
shriram.sampat
Posts: 38
Joined: Tue Nov 25, 2014 1:36 am

Outlook connector upgrade after zimbra upgrade

Post by shriram.sampat »

Hi Jorge,



I will test the help->upgrade option and post back here.



Thanks



Shriram
Post Reply